Education, Science, Technology, Innovation and Life
Open Access
Sign In

Research on Quality Control of Raw Material Testing and Testing in Highway Engineering—Taking the Third Section of Hainan Wanyang Expressway as an Example

Download as PDF

DOI: 10.23977/ftte.2024.040111 | Downloads: 0 | Views: 31

Author(s)

Wang Cheng 1, Li Min 1

Affiliation(s)

1 China Design Testing Technology Co., Ltd, Nanjing, China

Corresponding Author

Wang Cheng

ABSTRACT

At present, highway engineering construction is in a stage of rapid development, and there are frequent incidents of rework, scrapping, and even engineering accidents caused by substandard quality issues during the progress of engineering projects. The testing and testing of raw materials in highway engineering is an important basis for evaluating their quality. The testing results not only serve as a judgment standard that affects engineering construction and subsequent maintenance management, but also play an important role in influencing engineering quality control and completion acceptance evaluation. Based on this, this article discusses the factors that affect the testing and testing of raw materials in highway engineering, constructs a model, proposes quality control methods, and proposes countermeasures combined with the example of the testing and testing project in the third section of Hainan Wanyang Expressway, in order to effectively improve the management level and technical ability of highway engineering testing and testing.

KEYWORDS

Highway engineering, Experimental testing, Hainan Wanyang Expressway, Quality Control

CITE THIS PAPER

Wang Cheng, Li Min, Research on Quality Control of Raw Material Testing and Testing in Highway Engineering—Taking the Third Section of Hainan Wanyang Expressway as an Example. Frontiers in Traffic and Transportation Engineering (2024) Vol. 4: 88-96. DOI: http://dx.doi.org/10.23977/ftte.2024.040111.

REFERENCES

[1] Xiaobin Chen, Jiasheng Zhang, Xuan Wang. Full-scale field testing on a highway composite pavement dynamic responses [J]. Transportation Geotechnics, 2015, 4: 13-27.
[2] Li Yingyong, Li Guangyi, Ding Kai. The Development and Practice of China Highway Capacity Research[J]. Transportation Research Procedia, 2016, 15: 14-25.
[3] Donghai Liu, Min Lin, Shuai Li. Real-Time Quality Monitoring and Control of Highway Compaction[J]. Automation in Construction, 2016, 62: 114-123.
[4] Douglas Alleman, Arthur Antoine, Mia Schrilla. The Use and Performance of Alternative Contracting Methods on Small Highway Construction Projects[J]. Procedia Engineering, 2016, 145: 908-915.
[5] Danyang Su, Meng Li. Quality control approach for civil engineering construction[J]. Journal of Architectural Research and Development, 2019, 2:17-23.
[6] Wang Daopeng, Fan Jifei, Fu Hanliang, Zhang Bing. Research on Optimization of Big Data Construction Engineering Quality Management Based on RNN-LSTM[J]. Complexity, 2018, 123: 114-116.
[7] Raja Rafidah Raja Muhammad Rooshdi, Muhd Zaimi Abd Majid, Shaza Rina Sahamir. Relative Importance Index of Sustainable Design and Construction Activities Criteria for Green Highway[J]. Noor Akmal Adillah Ismail.Chemical Engineering Transactions (CET Journal), 2018,12: 12-17.
[8] Faiq M. S, Al-Zwainy, Reem Amer Mezher. Diagnose the Causes of Cost Deviation in Highway Construction Projects by Using Root Cause Analysis Techniques[J]. Arabian Journal for Science and Engineering, 2018, 4: 12-19.
[9] Iñaki Heras, Ernesto Cilleruelo, Jon Iradi. Standardization of management systems in Spanish care homes[J]. Leadership in Health Services, 2008, 11:34-37.
[10] Everett E. Adam. An international study of quality improvement approach and firm performance[J]. International Journal of Operations & Production Management, 1997, 9: 17-21.
[11] Andisheh Alimorad, Ali Moradzadeh, Reza Naderi, Mojtaba Zad Salehi, Afshin Etemadi. Prediction of geological hazardous zones in front of a tunnel face using TSP-203 and artificial neural networks[J]. Tunnelling and Underground Space Technology incorporating Trenchless Technology Research, 2008, 6: 11-17.
[12] Sangbok Lee, Byung Yong Jeong. Comparisons of Traffic Collisions between Expressway and Rural Road in Truck Drivers[J]. Safety and Health at Work, 2015, 6:22-27.
[13] M.A. Rabbani, T. Tsujimoto, M. Mitsuoka, E. Inoue, T. Okayasu. Prediction of the vibration characteristics of half-track tractor considering a three-dimensional dynamic model[J]. Biosystems Engineering, 2011, 2: 33-37.
[14] European. Effects of tractor weight, wheel placement and depth of ploughing on the infestation of perennial weeds in organically farmed cereals[J]. Journal of Agronomy, 2011, 4: 42-49.
[15] Mu-Kwang Kim, Sei-Hyun Lee, Yun Wook Choo, Dong-Soo Kim. Seismic behaviors of earth-core and concrete-faced rock-fill dams by dynamic centrifuge tests[J]. Soil Dynamics and Earthquake Engineering, 2011, 11: 44-47.
[16] Hernán R. Henríquez, Claudio Cuevas, Marcos Rabelo, Alejandro Caicedo. Stabilization of distributed control systems with delay[J]. Systems & Control Letters, 2011, 9:57-66.
[17] Yang Z C ,Xu D X. Intelligent Identification of High Rock-Filled Embankment Constitutive Model Parameters[J]. Advanced Materials Research, 2011, 1154(183-185): 2139-2142. 
[18] Daniel X, Wang, Michael D Conerly. Evaluating the power of Minitab's data sub setting lack of fit test in multiple linear regression [J]. Journal of Applied Statistics,2013, 200, 1: 2139-2142.
[19] Fang Wang, Xiaoyu Han. Research on the Optimal Density of Highway Network[J]. Procedia Social and Behavioral Sciences, 2013, 96: 1556-1565.
[20] Yapin WANG, Mengjun WANG. New Idea of Project Management Research on Harmonious Project Management theory. International Conference on Engineering Management and Service Sciences. September (20-22), 2009.
[21] Hyungjoo Choi, Giri Venkiteela, Amedeo Gregori, Husam Najm. Advanced Quality Control Models for Concrete Admixtures[J]. Journal of Materials in Civil Engineering, 2020, 32(2).
[22] Li L X ,Sun G Z ,Fan F Y. Static and Dynamic Test Detection of Steel Tube Truss Arch Bridge[J]. Applied Mechanics and Materials, 2012 , 1802(178-181): 2513-2520. 
[23] A. K. Chakraborty, A. K. Raina. Development of rational models for tunnel blast prediction based on a parametric study[J]. Geotechnical and Geological Engineering, 2004, 17:13-20.
[24] M. S. Diederichs. Manuel Rocha Medal Recipient Rock Fracture and Collapse Under Low Confinement Conditions [J]. Rock Mechanics and Rock Engineering, 2003, 22:44-49.
[25] G. V. Basheev, A. M. Efremo. Parameter Calculation for Efficient Allocation of Charge in Borehole During Bench Blasting of Rock [J]. Journal of Mining Scinence, 2003, 46:177-184.
[26] L. G. Wang, G. Tan. A Methodology for Predicting the In Situ Size and Shape Distribution of Rock Blocks[J]. Rock Mechanics and Rock Engineering, 2003, 11:46-52.
[27] N.A.Kassirova. Evaluation of the Efficiency of Methods of Removing External Water Pressure from Underground Structures [J]. Hydrotechnical construction, 2002, 4:21-29.

Downloads: 183
Visits: 12556

All published work is licensed under a Creative Commons Attribution 4.0 International License.

Copyright © 2016 - 2031 Clausius Scientific Press Inc. All Rights Reserved.